Welcome To HuaChun+
Changzhou HuaChun Automation Equipment Co., Ltd. is located beside the scenic national 5A-class tourist area - Tianmu Lake. We are specialized in providing professional equipments for radiator manufacturers, which have strong technical, full processing equipment, perfect detection methods and quality assurance system. Our company will be providing customers with better products and better service, by a full set of system in research and development, production, sales, service, with our enterprise spirit ”dedicated truth-seeking, asking for innovative”.
    Transformer radiator production line

    Our transformer radiator production line is developed innovatively on the basis of the technology from Heinrich and Georg (Germany) production lines, which can produce the radiator with the widths of 535,520,480,460,320,310 and the center distance longer than 400mm(500mm-4000mm), also depanding to the customers requirement……

  • Unreeling machine
  • Roll forming machine
  • Automatic closing machine
  • +
This line has many good properties as follows:
  • 01
    Full automation, Best quality reaching international advanced level
  • 02
    Different specifications of radiator produced
  • 03
    Good forming quality, High production efficiency and low cost
  • 04
    Welding process is mature and stable (PLC control)
  • 05
    Short production cycle,Timely delivery
They chose us+
Foreign clients
We warmly welcome the customers all over the world to
cooperate well with each other in the future.
E-mail:sales@tr-line.net
News+
  • JUL.172018

    Abnormal operation of transformer and acci...

    Radiator leakage oil, temperature difference, we should identify the reasons for timely pr……

  • JUN.292018

    Abnormal operation of transformer and acci...

    Radiator leakage oil, temperature difference, we should identify the reasons for timely pr……

  • MAY.172018

    Abnormal operation of transformer and acci...

    Radiator leakage oil, temperature difference, we should identify the reasons for timely pr……

  • MAR.112018

    Abnormal operation of transformer and acci...

    Radiator leakage oil, temperature difference, we should identify the reasons for timely pr……

  • Top